Project Details

Project Date: 2021-06-03

Project Image

Description:
Due to Egypt limited energy resources, Egypt general policy is to generate its energy through renewable energy, therefore the proposed Damiette Hydropower Plant will be located on the left side of the river; adjacent to the campus of National Water Research Center (NWRC) is one of the best to be used in this region. The project aims to prepare, study and submit an EIA report for the proposed feasibility study project component of 13 MW Hydropower Plant on the Delta Barrage during different phases (pre- construction phase, construction phase and post construction phase "operation phase"). As well as setting the necessary mitigation measures in order to reduce the negative impacts of each phase on the River Nile environment " Damiette Branch and Mohamed Ali Barrage"